The channel configuration may include the optional consolidation point as well as a cross-connect. Often there is just a patch panel in the equipment room.

 
The channel, as described in TIA 568B and ISO 11801, includes up to 90 meters of horizontal cable, a work area equipment cord, an optional transition point, 2 cross-connections in the telecommunications closet, a patch jumper between these two connections, and a telecommunications closet equipment cord. In simple terms, the channel includes everything necessary to get data from a PC in an office to a hub in a wiring closet.
 
The channel does not include the mated connection at the hub or PC. This means the plug at the end of the user's patch cord at both ends of the link is considered part of the data terminating equipment (DTE) and not part of the link. The reason for this is connectors must be considered as mated pairs of plugs and jacks, and since the jack is fixed in the DTE it was decided that connection would be part of the DTE.
The link model corresponds to testing parameters that must be used in the tester. To obtain accurate test results, each link model must be clearly defined. Keep in mind that each standards organization has chosen different parameters.
 
In practice, the channel is rarely used in link certification, because user patch cords are almost never available when the permanent cabling is installed.
 
 
 
相关文章:
 
1. 通道测试的挑战
 
2. Cabling Test Configurations Explained Channel - Permanent link - Consolidated Point link
   
 
六类布线系统测试的挑战
链路模型的变化
  • 永久链路模型(新增)
  • 通道模型
  • 基本链路模型(取消)
  • 带宽与参数的变化
    测试精度的变化